Several blogs over the past few months have dealt with the building and placement of bents on the Ark. From the very first placement of a half bent on June 15, to our current number of 17 bents being in place, the crew at the Ark Encounter construction site is assembling and placing them as fast as the shipment of wood arrives from Colorado. Recently, AiG lead audio/video editor for Ark Encounter, Peter Kappes, caught up with one of our contractors and had him give us a walk-through of how the bents are constructed and installed.